IMPL structure

Checklist

 

IPL skin softening instrument Model PLM-1 main accessories
Therapy head 2 sets
Spectral range 1 piece
Protective glasses 1 piece
Eyeshade 1 piece
Dust shade 1 piece

 

Documents bag
Warranty card 2 pieces
User’s guide 1 piece

 

Protective shade for light-guiding crystal 2 pieces
Fuser 2 pieces
User’s key 2 pieces

 

Unpacking

Open the upper cover of the packing box first, and inspect the entire appearance of the instrument, check the accessories according to the checklist.

IMPL Schematic diagram

IMPL Diagram

  1. Control panel
  2. Urgent stop switch
  3. User key switch
  4. Changeover switch (upward: skin softening, downward: hair removal)
  5. Main body
  6. Mounting socket for therapy head
  7. Therapy heads (white head for hair removal, green head for skin softening)

Open the upper cover of the packing box first, and inspect the entire appearance of the instrument, check the accessories according to the checklist

The instrument consists of main case, therapy head, and accessories. Within the main case there are power supply unit, cooling system, and control system. Outside the main case there are therapy head, power supply cable etc.

Control panel

IMPL Control Panel

  1. LCD screen
  2. Stand-by button
  3. Menu button
  4. Up button (for increasing parameters)
  5. Down button (for decreasing parameters)
  6. Enter button
Therapy head

It consists of focusing-coupling cavity, light-guiding crystal, selective medium film, and photon emission lamp.

Cooling system

To make sure of the output stability in a predetermined energy density, and to prolong the life span of the photon emission lamp, the instrument uses circulating water to take away surplus heat and unnecessary light energy. It consists of a water container, a magnetic pump, circulating pipe, and a condenser.

Water filling

The water container had been filled with distilled water before delivery of the instrument. If more water is needed, please do the following:

  1. Pull out the power supply plug.
  2. Open the rear side panel to get to the water container. Open the air outlet cap, pull out the soft plugs for the water inlet and outlet tube, then you can fill up with water. Please pay attention to the water level gauge. When the water level is 2 cm distance apart from the top of the container, water filling should be stopped.
  3. The cooling water should be distilled water. Don’t splash electronic units or components with water, otherwise, don't turn on the power to avoid short-circuit.
  4. After water filling is finished, insert the soft plugs and cover the air outlet cap to avoid water leakage.